Plan a refactor that spans multiple files. First map every call site / dependency affected. Apply the change in small, behavior-preserving steps; after EACH step run the full test suite and commit only if green. If a step changes behavior, revert and rethink. Repeat until the refactor is complete, all references are updated, and the suite is green.
Two reviewers from different model families, each in a fresh context, must both pass an objective rubric before a PR is opened — the maker-checker split with real model diversity. Each failed round fixes only what was flagged and re-reviews with reviewers that have no memory of the last round, so nothing anchors on prior findings. Hard cap of three rounds, tests may never be edited to pass, and the loop ends by opening a PR rather than pushing. Adapted from ECC's /santa-loop (affaan-m/ECC, MIT), which auto-pushes on agreement and has no verifiable exit; this version adds the test-exit condition and the human merge gate.
/goal Ship the current diff only after two independent reviewers both PASS. Scope is `git diff --name-only HEAD` (or the paths I name). First write a rubric with objective PASS/FAIL criteria: correctness, security (no secrets, injection, OWASP top 10), error handling, completeness, internal consistency, no regressions. Each round launch two reviewers in parallel with fresh context and no memory of earlier rounds: Reviewer A is a Claude subagent, Reviewer B is a different model via `codex exec --sandbox read-only` (fall back to a second Claude subagent and say so in the report). Both return a JSON verdict with per-criterion PASS/FAIL and critical issues. If either FAILs: fix only the flagged issues with minimal diffs, never modify the tests to make them pass, commit "fix: address review findings (round N)", run `npm test`, and re-review with fresh reviewers. Exit when both reviewers PASS and `npm test` exits 0 — then open a PR for me to merge; never push to main or merge. Stop after 3 rounds; if still failing, print the unresolved issues and escalate to me instead of shipping.
Write a one-page brief where every claim has three or more sources and every link is opened and confirmed to support the claim — the loop that catches hallucinated citations a single prompt never can.
/goal write a one-page brief on [TOPIC] where every claim has at least three sources and every link opens to a real page that supports the claim. Open each link to confirm it before you call it done. Replace any source that is dead or does not back up the claim. Done when every source check passes on every claim — maximum 30 iterations.
Query the catalog for unindexed foreign keys, create a migration per missing index, and verify each with a full test run until all FKs are covered or 6 turns complete.
/goal every foreign key in the schema has a covering index — query the catalog (pg_catalog or information_schema) to list FKs with no matching index, add one migration per missing index, and re-run the catalog check until it returns zero rows. After each index, apply the migration on a scratch database and run the full test suite to verify nothing regresses; stop after 6 turns. Only add indexes — never change constraints or table definitions — and propose the final migration set as a PR for review.
/goal Implement the work described in PLAN.md. Stop only when npm run lint and npm run test:e2e pass. Follow AGENTS.md, keep changes scoped, and report verification evidence Stop after 25 turns even if the goal is not reached.
Scan the dependencies of [authorized project or current repository] for known CVEs using current advisory sources. If you cannot access the dependency graph, repository, or current advisories, report the blocker and stop. For each high or critical finding, identify the affected direct or transitive dependency, determine whether the vulnerable code is reachable, and check whether the exploit conditions exist in this project. Rank findings by severity, reachability, exposure, and available remediation. Patch or upgrade the highest-risk reachable dependency using the smallest credible change. Run the build, tests, and security scan again. Keep the change only if verification passes and no unacceptable regression appears. Repeat until no exploitable high or critical CVE remains, or every remaining finding has an evidence-backed reachability assessment and an approved risk decision. Ask before major or breaking upgrades, production changes, or accepting risk. Finish with the CVE inventory, reachability evidence, fixes, verification results, and remaining risks.
Move the project to the current Node LTS across .nvmrc, CI config, Dockerfiles, and engines, fixing deprecations until everything is green on the new runtime.
/goal the project runs on the current Node LTS — update .nvmrc, the engines field, CI workflow files, and any Dockerfile base images to the LTS version, then run install, build, lint, and the full test suite on it, fixing deprecation warnings and breakages one at a time; stop when all are green or after 15 turns
/goal every path in openapi.yaml has a contract test asserting its status codes and response schema — add tests for one untested endpoint per turn, run the suite, and fix either the spec or the handler when they disagree (tell me which you chose); stop when all paths are covered or after 15 turns
Shrink the production JavaScript bundle under a hard budget by attacking the largest modules with code-splitting, lighter imports, and dead-weight removal.
/goal the main production bundle is under 250 KB gzipped — run the build with the bundle analyzer, address the single largest contributor each turn (code-split it, replace it with a lighter import, or drop it), and confirm the build and tests stay green; stop at the budget or after 10 turns
Instrument the test suite with query logging, find endpoints issuing N+1 queries, and fix them with eager loading or batching until the hot paths are clean.
/goal no endpoint in the integration test suite issues more than 10 SQL queries per request — enable query logging in the test environment, find the worst N+1 offender, fix it with eager loading or a batched query, verify the count dropped and tests still pass, then move to the next; stop after 12 turns
Email is the missing tool in your harness. ConnectMyEmail gives Claude Code and Codex a clean MCP into Gmail, iCloud and IMAP — triage, drafts, follow-ups, on a loop.
/goal `npm outdated` lists no minor or patch updates — upgrade exactly one package per turn, run tests, lint, and build after each, commit if green, and pin the previous version with a note in UPGRADE-BLOCKERS.md if it fails; stop after 20 turns
/goal the recent diff is clean and convention-aligned — review it for debug code, dead branches, and bad names, fix with minimal edits until `npm run lint && npm test` passes; stop after 4 turns
/goal a PR is open for this change and every CI check passes — implement it, test locally, push, open the PR with `gh pr create`, then keep fixing failures (re-check with `gh pr checks`) until green; stop after 10 turns